Motor Operator Installation
The most current versions of Lawrence Doors motor operator and fire door operator installation instructions are available below. Installation instructions are intended for qualified door systems technicians using proper tools and equipment.
- Instructions include wiring diagrams and control connection drawings. (NOTE – Verify wiring diagram number in the instructions is the correct diagram for the version of operator being used.)
- Quick-Start Guides provide an overview of basic set-up and connections.
- Please contact us for prior versions of instructions or wiring diagrams, or for additional information.
View or download PDF documents from the links below (Please note that some of these are large files):
Motor Operators
- Instructions – SGH Motor Operator Installation
- Instructions – MGH Motor Operator Installation
- Instructions – MGRL Motor Operator with Lock Sensor Installation
- Instructions – STK-CP Tubular Motor Operator Installation
- Instructions – STK-EP Tubular motor Operator Installation
- Quick Start – SG Series
- Quick Start – MG Series
- Field Conversion – SG Series 230v-3ph to 208v-3ph
- Field Conversion – SG Series 230v-1ph to 208v-1ph
- Field Conversion – MG Series 230v-3ph to 208v-3ph
- Field Conversion – MG Series 230v-1ph to 208v-1ph
High Performance Motor Operators
- Instructions – HGH 2HP High Performance Door Motor Operator Installation
- Instructions – HGH 3HP High Performance Door Motor Operator Installation
- Quick Start – HG Series
- Field Conversion – HGH 2 HP-230v-1ph to 208v-1ph
Fire Door Motor Operators
- Instructions – FGH Fire Door Motor Operator Installation
- Instructions – FGRL Fire Door Motor Operator with Lock Sensor Installation
- Instructions – AR-C “Auto-Reset” Conversion Module Installation (for FG and FH series operators)
- Instructions – FS “Auto-Reset” Fire Door Motor Operator Installation
- Instructions – FSH “Auto-Reset Plus” Fire Door Motor Operator
- Instructions – FSML “Auto-Reset” Fire Door Motor Operator with Lock Sensor Installation
- Instructions – FTS “Auto-Reset” Tubular Fire Door Motor Operator Installation
- Quick Start – FG Series
- Quick Start – FS Series
- Field Conversion – FG Series 230v-3ph to 208v-3ph
- Field Conversion – FG Series 230v-1ph to 208v-1ph
- Field Conversion – FS Series 230v-3ph to 208v-3ph
- Field Conversion – FS Series 230v-1ph to 208v-1ph
NEMA 7/9 “Explosion Proof” Motor Operators
- General Information for All NEMA 7/9 Motor Operators
- Instructions – SHN79 Motor Operator Installation
- Instructions – FHN79 Fire Door Motor Operator Installation
- Instructions – FSN79 “Auto-Reset” Fire Door Motor Operator Installation
Accessories
- Instructions – PBU Battery Backup Unit Installation
- Instructions – ELBP Extended Life Battery Pack (for PBU)
- Instructions – R-BBU Battery Backup Installation (for FS)
- Instructions – ELS Extra Limit Switch Assembly (auxiliary open & close limit)
- Instructions – Reclose Timer Module
- Instructions – Monitored Sensing Device Adapter (for legacy operators with no monitoring function)
- Instructions – SRPE Monitored Reflective ELR Sensor Installation
- Instructions – NMPE Non-Monitored Reflective ELR Sensor Installation
- Quick Start – REK Wireless Sensing Edge Connection
General Information
Lawrence Roll-Up Doors, Inc. reserves the right to change specifications without notice. Refer to Standard Specifications sheets (available upon request) for complete product information. © 2024 Lawrence Roll-Up Doors, Inc.